Panels and connection components
Confirm the wall and roof panels, timber members, splines and fixings included in the quotation. Do not assume that every ancillary material is included.

Ready-to-Assemble SIP building kits
More than a collection of panels: a Quacent Ready-to-Assemble SIP Building Kit is prepared around your building design. Panels, connection components, identification and documentation form one coordinated supply for the team assembling the project.
A kit is specified through its components and the information needed to identify them. Compare offers against the same design revision and agreed scope, including the items your local team will source separately.
Confirm the wall and roof panels, timber members, splines and fixings included in the quotation. Do not assume that every ancillary material is included.
Agree how panel references correspond with layouts, component lists and assembly information. Keep the issued revision available to both the receiving team and the installer.
Check the connection with the foundation, windows, roof covering, façade and services. Their specification and installation require coordination even when they are outside the kit supply.

The components behind the kit
These groups describe what a project-specific kit can contain. Your quotation identifies the actual applications, quantities and optional services.
Wall, roof, floor or internal-wall applications where included in the design and quotation. Panel thickness and geometry follow the project specification.
Connection timber, LVL or laminated members and steel connections where specified. Agree how these connect to structures supplied by others.
Fasteners, tapes, membranes and other sealing products where itemised. The selected products must match the agreed construction details.
Panel layouts, connection details, installation information and agreed calculations for the supplied scope. Confirm the document list and revisions before production.


Transport and assembly support are agreed separately. Foundations, fit-out and local lead structural engineering are not automatically included.
Compare the supply responsibilities01 / Understand your supply
Ready to Assemble describes how the supply is organised around the building. The physical elements are prepared for identified locations, while connection references and the document set relate those elements to the approved design. Your team receives a kit to assemble, rather than having to develop the panel layout from a delivery of unassigned standard sheets.
Panel preparation, identification and documentation are coordinated around an agreed design. The quotation and approved project documents define the actual kit contents.
| Item | Quacent kit or agreed support | Project team responsibility |
|---|---|---|
| SIP elements | Project-specific panels for the wall, roof or other applications included in the quotation. | Confirm the building design, required performance and the intended panel applications. |
| Connections & accessories | Connection materials, fasteners and sealing products as itemised in the agreed supply. | Check interfaces with foundations, other structural elements and materials supplied locally. |
| Identification & packing | Panel identification, packing information and agreed assembly sequence coordination. | Provide site access, unloading, lifting arrangements and suitable protected storage. |
| Engineering & documentation | Panel layouts, connection information and calculations for the agreed supplied scope. | The local lead structural engineer coordinates the overall building, foundations and interfaces. |
| Transport & delivery | By agreement Transport scope, delivery terms and any split deliveries are defined in the quotation. | Confirm the delivery location, access limitations and who receives and unloads the kit. |
| Assembly support | By agreement Technical start-up or assembly support can be discussed for the project. | Appoint a competent assembly team and arrange site supervision, safety and equipment. |
| Foundation, fit-out & approvals | Not automatically included in the RTA kit supply. | Arrange foundation works, local approvals, building services, finishes and other works outside the quotation. |
On a small screen, swipe the table sideways to compare the responsibilities.
02 / Panel system
The SIP system combines OSB faces with an insulating core. Panel selection and connection details need to be coordinated with the structural design and the complete building envelope.
Read the specification in layers: the SIP itself, its edge and connection components, and the adjoining internal and external construction. The kit can be a defined part of a larger wall or roof assembly. Identifying those layers makes the boundary between supplied components and locally arranged work understandable to designers and installers.
These are product options, not a performance declaration. Confirm the selected specification and its supporting documentation for your project.

03 / Before engineering
We can review a concept, but production requires a coordinated design and agreement on the supplied scope.
04 / Delivery & assembly
RTA brings preparation forward. Successful assembly still depends on agreed responsibilities, suitable equipment and an informed building team.
Share the drawings, location, intended use and build programme.
Agree the kit contents, interfaces and any additional support.
Coordinate panel layouts and connections for the agreed supply.
Prepare the project-specific panels, components and identification.
Coordinate packing, transport and the site’s unloading arrangements.
Your building team assembles the kit using the agreed documentation.

Confirm the assembly team, lifting plan, access and protected storage before delivery. Any Quacent start-up support or additional attendance must be agreed in the project scope.
Discuss assembly support↗05 / Before you order
No. Quacent primarily supplies the SIP building kit. Foundations, services, fit-out, finishes and local lead structural engineering are not automatically included. The quotation states the supplied components and any additional services.
No. Panel applications, thicknesses, connections and supporting components depend on the project design. They must be checked against structural, building-envelope and local regulatory requirements.
The kit is intended for competent building and assembly teams using the agreed documentation. Review the team’s experience, site equipment and support needs with Quacent before the delivery is scheduled.
Start with PDF plans, sections and elevations. For DWG or IFC files, send a download link or agree a transfer method with the team. Identify the drawing version and any requirements that are still under development.
No automatic compliance is implied. The relevant local requirements and complete construction must be checked for the project. Your appointed designers and local lead engineer coordinate this with the agreed Quacent supply.
From specification to site
The projects on this website were supplied as Ready-to-Assemble SIP Kits. Their models show the engineered geometry and their site photographs show the kit within a wider building process. Use these references to discuss the type of preparation you need, then define your own package through the drawings and supply schedule.
For a comparable quotation, the useful starting point is the proposed building and the components required for it. Floor area describes the accommodation; supplied panel quantities describe a different part of the project. The design geometry and agreed scope are needed to connect the two.
Factory preparation, component identification and a coordinated site sequence connect the kit to the building design. Production information links the panel layout to the machining operations.

Check the panel applications, the agreed accessories and which drawings or calculations are included. Define transport, unloading, local assembly and any Quacent attendance separately.
Confirm the current drawing revision and the people authorised to approve it. Resolve dimensions, openings and junctions before manufacture. A later design change can affect components, documentation and delivery.
Request a technical introductionStart with your project
Share your drawings, project location and the support you need. We will discuss the kit scope and the next design decisions with you.
The building geometry, supplied panel area, specification, connection details, engineering scope, delivery arrangements and agreed support all affect the quotation. Send your drawings so that we can define a comparable supply scope.